Copyright © 2024 Wuxi Rigid Machinery Co., Ltd. All Rights Reserved. Sitemap | RSS | XML | Privacy Policy
① Heavy lifting hook Configuration for 1:1 Process. The end of the steel wire rope should be connected by aluminum riveting or standard wedge sleeve; Configuring telescopic rods for easy suspension outside the shaft. ② Canopy Effectively prevent falling objects from high altitude, assemble with wooden boards according to actual site dimensions. ③ Climber LTD100 multiple speed modes climber optional, speed 9-18m/min; Connecting through the climber adapter platform; Applying Ф 10.2 High-strength steel wire rope. ④ Overspeed safety lock OSL510 Overspeed lock with a rated load of 1,000kg; The platform will automatically lock when it descends more than 30m/min or 42m/min; Applying Ф 10.2 High-strength steel wire rope. ⑤ Safety lock adapter The OSL510 safety lock is integrated with the climber through an adapter. ⑥ All aluminum work platform
Aluminum protective railings should be installed around the platform; The floor shall be of wood not less than 15mm in thickness. ⑦ Anti-derailment protection system The climber control box is equipped with an anti-derailment switch socket. The anti-derailment switch component should be connected to the climber and installed on the platform to support the guide rail laterally. ⑧ Safety tong assembly Before operation, it shall be manually adjusted to keep the safety gear in the open state, otherwise the platform will automatically lock; When the steel wire rope of the climber is not under force, it will automatically lock the platform, which is the second falling protection of the platform. ⑨ Heavy hammer Two heavy hammers are used to maintain the safety lock and the steel wire rope of the climber is suspended vertically. |