Process 1:1 False car

  ① Heavy lifting hook
Configuration for 1:1 Process.
The end of the steel wire rope should be connected by aluminum riveting or standard wedge sleeve;
Configuring telescopic rods for easy suspension outside the shaft.
② Canopy
Effectively prevent falling objects from high altitude, assemble with wooden boards according to actual site dimensions.
③ Climber
LTD100 multiple speed modes climber optional, speed 9-18m/min;
Connecting through the climber adapter platform;
Applying Ф 10.2 High-strength steel wire rope.
④ Overspeed safety lock
OSL510 Overspeed lock with a rated load of 1,000kg;
The platform will automatically lock when it descends more than 30m/min or 42m/min;
Applying Ф 10.2 High-strength steel wire rope.
⑤ Safety lock adapter
The OSL510 safety lock is integrated with the climber through an adapter.
⑥ All aluminum work platform
DBG spacing (mm) Extension distance (mm)
1200—2000 1500—2000
1500—2600
1700—3000
Bidirectional adjustment within the gauge range as needed;
Aluminum protective railings should be installed around the platform;
The floor shall be of wood not less than 15mm in thickness.
⑦ Anti-derailment protection system
The climber control box is equipped with an anti-derailment switch socket.
The anti-derailment switch component should be connected to the climber and installed on the platform to support the guide rail laterally.
⑧ Safety tong assembly
Before operation, it shall be manually adjusted to keep the safety gear in the open state, otherwise the platform will automatically lock;
When the steel wire rope of the climber is not under force, it will automatically lock the platform, which is the second falling protection of the platform.
⑨ Heavy hammer
Two heavy hammers are used to maintain the safety lock and the steel wire rope of the climber is suspended vertically.